Project Number 3
Built for [Client Name], Circa 2026
This automated line was a collection of [NUMBER] separate assemblies designed to trim, deburr, band, and label plastic pipes from 13 to 30 feet long. Video footage was taken during pre-installation testing at SDSMA’s Inman facility.





[Cool Facts]
The line includes the following sections:
- Adjustable transfer ramp
- Cutting area
- Gasket stretcher/placer
- Shrink wrapper
- Barcode labeler
- Taping &
- Rolling conveyor
Machine Specs
- Automated operation
- Adjustable ramp transfers pipe from
Services Performed
- Mechanical Engineering
- Electrical Schematics
- Control Panel Design and Build
- PLC Programming
- Fabrication & Assembly
- In-House Testing/Calibration
- On-Site Installation
- Support and Maintenance